Affiliation:
1. University of Johannesburg , South Africa
Abstract
Abstract
Many research efforts have identified funding as a critical factor responsible for the delays in the execution of construction projects. These funding challenges affect the client and contractors alike. However, there is limited information on why delays occur in sponsored projects with evidently adequate funding. Therefore, the study focuses on exploring the factors that impact the cash flow during the execution of sponsored construction projects. The multiple-site case-study method of qualitative research was adopted, involving five universities benefiting from the infrastructure funding provided by a government agency in Nigeria. The Delphi technique was used for data collection and analysis, complemented with interviews. The findings identified six factors causing the delays. They were divided into internal and external factors. The internal factors are faulty contractor selection processes resulting in delays by contractors and the failure to complete appropriate phases of a project. The external factors include the delays in the project management system of the funding agency in terms of inspection, monitoring, evaluation and progress certification. The research identified that the combined effect of internal and external factors negatively impacts the project cash flow, which in turn influences project delivery delays. Therefore, this study recommends improvements in the in-house contractor selection processes and the decentralisation of the project inspection, monitoring and evaluation operations of the funding agency. This will facilitate timely inspection, audit, and progress certification, enabling the early release of the second tranche of the project fund. This will ameliorate the negative effects arising due to low cash flow and associated delays in project delivery.
Subject
Management of Technology and Innovation,Industrial and Manufacturing Engineering,Strategy and Management,Management Information Systems
Reference25 articles.
1. Al-Joburi, A. I., Al-Aomar, R., & Bahri, M. E. (2012). Analyzing the impact of negative cash flow on construction performance in the Dubai area. Journal of Management in Engineering, October. doi: 10.1061/(ASCE)ME.1943-5479.000012310.1061/(ASCE)ME.1943-5479.0000123
2. Babatunde, S. O., Opawole, A., & Ujadughe, I. C. (2010). An appraisal of project procurement methods in the Nigerian construction industry. Civil Engineering Dimension, 12(1), 1-7. doi: 10.9744/ced.12.1.1-710.9744/ced.12.1.1-7
3. Day, J., & Bobeva, M. (2005). A generic toolkit for the successful management of Delphi studies. The Electronic Journal of Business Research Methodology, 3(2), 103-116.
4. Deep, S., Bilal, M., & Ahmad, S. (2017). A study of various factors affecting contractor’s performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), 28-33.
5. Doloi, H. (2009). Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), 1245-126. doi: 10.1080/0144619090339454110.1080/01446190903394541
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献