1. Abramovsky, L., Bond, S., Harrison, R., & Simpson, H. (2005). Election Briefing Note No. 6. London, United Kingdom: The Institute for Fiscal Studies.
2. Adams, S. (1989). Practical Buildability. Construction Industry Research and Information Association (CIRIA), Building Design Report.
3. Agyarkwah-Baah, A., & Fugar, F. DK. (2010). Delays in Building Construction in Ghana. Australian Journal of Construction Economics and Building, 10(1/2), 103–116. https://doi.org/10.5130/ajceb.v10i1/2.159210.5130/ajceb.v10i1/2.1592
4. Akomah, B. B., Boakye, N. A., & Fugar, F. D. K. (2010). Safety on construction sites: The role of the employer and employee. In S. Laryea, R. Leiringer, & W. Hughes (Eds.). Proceedings of the West Africa Built Environment Research (WABER) Conference (pp. 477–49). Accra, Ghana.
5. Akomah, B. B., Zakari, M., & Enoch Ayeh, E. (2020). Impact of Cost of Construction Projects in Cape Coast Metropolis. Buletinul Institutului Politehnic Din Iaşi, 66(1), 95–112.