Abstract
Abstract
In this study, simulation application on a shirt production line was studied. In order to determine which of the two different working methods, with or without yarn clearing, is more efficient, the duration of the operations was taken and work flows created by applying a work and time study. Then, the theoretical distributions of the collected data were analyzed and the distributions of the data obtained transferred to the simulation model. After the model was established, it was run and its validity tested by comparing it with the real system. A new algorithm was developed that can be applied together with simulation to determine the most suitable production method.
Reference17 articles.
1. Cocks S, Harlock S. Computer-aided Simulation of Production in the Sewing Room of a Clothing Factory. J Text Inst. 1989;80(s):455–463.,
2. Rajakumar S, Arunachalam V, Selladurai V. Simulation of workflow balancing in assembly shopfloor operations. J Manuf Technol Manag. 2005;16:265–281.
3. Zielinski J, Czacherska M. Optimisation of the Work of a sewing team by using simulation. Fibres&Textiles in Eastern Europe. 2004;12:78–83.
4. Ünal C, Tunalı S, Güner M. Evaluation of Alternative Line Configurations in Apparel. Textile Res J. 2008;79:908–916.
5. Ünal C, Kaya A, Erdoğan M, Güngör A. Improving the Apparel Production Process by Using Simulation Modelling with a Waves Algorithm. FIBRES & TEXTILES in Eastern Europe 2021; 29, 4(148): 32–38.