Author:
Bugajski Piotr M.,Kurek Karolina,Młyński Dariusz,Operacz Agnieszka
Abstract
Abstract
The paper presents the results of the analysis concerning the verification of the actual hydraulic load and the load of organic pollutants compared to the conditions designed for 4 household wastewater treatment plants. The researches were carried out in the annual period from May 2015 to April 2016. Based on the conducted analysis, it was found that objects act as underloaded hydraulically and the actual inflow of sewage to the analysed objects during the research period ranged from 7.3% to 32.7% in relation to the inflow assumed in the project. Furthermore, in the case of loading the treatment plant with the load of pollutants expressed as PE, it was fund that the actual PE values were lower than assumed in the project. Therefore, it is important that the sizes of the series of household sewage treatment plants were selected depending on the individual conditions of household, i.e. the number of inhabitants or the amount of consumed water.
Subject
Agricultural and Biological Sciences (miscellaneous),Water Science and Technology,Development,Geography, Planning and Development,Environmental Engineering
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献