Recent Progress in Full Scale Fatigue Test of PZL-130 "Orlik" TC-II Structure
Author:
Reymer Piotr,Leski Andrzej,Dragan Krzysztof
Abstract
Abstract
This article presents preparation of the Full Scale Fatigue Test of the PZL-130 "Orlik" TC-II. After completing the flight load acquisition stage [1] a load block representing 200 Simulated Flight Hours in 194 flights was developed. This load block was further modified in order to introduce fatigue markers on the crack surface [2] visible during Quantitative Fractography, planned to take place during the Teardown Inspection of the structure after completion of the test. Meanwhile, the test rig along with the loading system and the test specimen were prepared at Výzkumný a Zkušební Letecký Ústav (VZLU, Prague, Czech Republic). The test specimen, consisting of the overhauled fuselage, modernized wings and the landing gear, was instrumented with the identical strain gauge measuring system as presented in [3], which was calibrated before the commencement of fatigue testing. Finally, some preliminary issues encountered during the fatigue test startup were highlighted and the outline for future work was described
Publisher
Walter de Gruyter GmbH
Subject
Mechanics of Materials,Safety, Risk, Reliability and Quality,Aerospace Engineering,Civil and Structural Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献