Affiliation:
1. University of Warmia and Mazury in Olsztyn , Poland
Abstract
Abstract
The article aims to present practical methods for prioritising the activities of maintenance departments based on the Pareto analysis and the failure risk analysis. Based on the collected data on the number of observed failures and their removal times, commonly known reliability indicators were determined, which were then used to estimate the probabilities and consequences of failures in terms of the risk of loss of production continuity. Based on commonly collected failure data, the developed methods allow proposing to the maintenance departments the sequence of maintenance and repair work to be undertaken in terms of minimising the risk of failure. Risk analysis is somewhat commonly used in the practice of maintenance departments (e.g. RBI, FMEA, ETA, FTE, HIRA). The added value of this work is the use of reliability indicators for estimating the values of risk components, i.e., probability and consequences. The method was developed on the basis of operational data collected in one of the plants of the dairy cooperative and, after assessing the effects of its implementation, it was implemented in other enterprises of the cooperative.
Subject
Management of Technology and Innovation,Industrial and Manufacturing Engineering,Strategy and Management,Management Information Systems
Reference66 articles.
1. Ahlmann, H. (2002). From traditional practice to the new understanding: the significance of the Life Cycle Profit concept in the management of industrial enterprises. Maintenance Management & Modelling conference. International Foundation for Reseach in Maintenance.
2. Ahmadi, A., & Soderholm, P. (2008). Assessment of operational consequences of aircraft failures: Using event tree analysis. 2008 IEEE Aerospace conference, 1–14.
3. Al-kaabi, H., Potter, A., & Naim, M. (2007). Insights into the maintenance, repair and overhaul configurations of European airlines. Journal of Air Transportation, 12(2), 27–42.
4. Arunraj, N. S., & Maiti, J. (2007). Risk-based maintenance—Techniques and applications. Journal of Hazardous Materials, 142(3), 653–661.
5. Bevilacqua, M., & Braglia, M. (2000). The analytic hierarchy process applied to maintenance strategy selection. Reliability Engineering and System Safety, 70(1), 71–83.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献