1. Balkau, B.J. (1975). A financial model for public works programmes. National ASOR Conference. Sydney: ASOR.
2. Banki M.T. & Esmaeili B. (2009), The Effects of Variability of the Mathematical Equations and Project Categorizations on Forecasting S-Curves at Construction Industry. International Journal of Civil Engineering. Vol. 7(4), 258-270.
3. Blyth, K. & Kaká, A.P. (2006). A novel multiple linear regression model for forecasting S-curves. Engineering. Construction and Architectural Management. Vol. 13 (1): 82-95.
4. Bromilow, F.J. & Davies, V.F. (1978). Financial planning and control of large programmes of public works. In Second International Symposium on Organisation and Management of Construction, Organising and Managing Construction. Technion, Israel Institute of Technology, Haifa, Israel. Vol. 2: 119-133.
5. Carlberg, C. (2012). Análisis estadístico con Excel. Madrid: Ediciones Anaya Multimedia.