Affiliation:
1. Bialystok University of Technology, Bialystok , Poland
Abstract
Abstract
According to the Theory of Constraints by Goldratt system bottlenecks are key to improving productivity and profitability of the entire production system. An important issue in the practical application of this theory is to identify bottlenecks in the system. The aim of this paper is to develop practical steps to identify bottlenecks in the production system characterised by a homogeneous flow. The paper includes a case study which shows six steps that allowing to specify not only the first bottleneck of the system but to develop a comprehensive plan for removing bottlenecks.
Subject
General Chemical Engineering
Reference13 articles.
1. Alsmadi, M., Almani, A. and Khan, Z. (2014). Implementing an integrated ABC and TOC approach to enhance decision making in a Lean context: a case study. International Journal of Quality & Reliability Management, 31(8), pp. 906-920.10.1108/IJQRM-04-2013-0063
2. Costas, J., Ponte, B., de la Fuente, D., Pino, R. and Puche, J. (2015). Applying Goldratt’s Theory of Constraints to reduce the Bullwhip Effect through agent-based modeling. Expert Systems with Applications, 42, pp. 2049-2060.10.1016/j.eswa.2014.10.022
3. Dulina, L., Mleczko, J. and Mičieta, B. (2013). Identification of Bottlenecks in the Unit Make to Order Production. Applied Computer Science, 9(2), pp. 43-56.
4. Goldratt, E.M. (1990). What is This Thing Called Theory of Constraints and How Should it be Implemented? New York: North River Press.
5. Golmohammadi, D. (2015). A study of scheduling under the theory of constraints. International Journal of Production Economics, 165, pp. 38-50.10.1016/j.ijpe.2015.03.015
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献