Assessment of Risk Management Maturity of Construction Organisations in Joint Venture Projects

Author:

Abdulrahman R. S.1,Ibrahim A. D.2,Chindo P. G.3

Affiliation:

1. Assistant Lecturer, Department of Quantity Surveying , Ahmadu Bello University , Zaria , Kaduna State, Nigeria .

2. Professor, Department of Quantity Surveying , Ahmadu Bello University , Zaria , Kaduna State, Nigeria .

3. Senior Lecturer, Department of Quantity Surveying , Ahmadu Bello University , Zaria , Kaduna State, Nigeria .

Abstract

Abstract For organizations to be successful, they should be committed in managing risk proactively and consistently throughout the project and equally important is the determination of the Risk Management Maturity (RMM) of organizations because it is the commencing point in the review of the current RM systems, practices, and culture of construction organisations. It was reported that construction organisations lack the knowledge of their capability to manage risk and as a result, JV projects continue to fail. Studies have identified, categorised and assessed risk associated with JV projects in their local and international context but no study has assessed the RMM of construction organisations in JV projects. Therefore, this study assessed the RMM of construction organisations in JV projects. The attributes and dimensions used to assess the RMM of construction organisations were identified from literature and used in the survey to collect data from respondents and subsequently analysed using the Fuzzy synthetic evaluation technique. Findings revealed that construction organisations undertaking JV projects are at the “defined maturity level” which means that these organisations only practice informal risk management and uses only qualitative risk assessment technique. The study recommends that further studies should focus on how to improve and move from the current RMM level of construction organisations to the next maturity level (managed and optimised).

Publisher

Engineering, Project, and Production Management (EPPM)

Subject

Mechanical Engineering,Engineering (miscellaneous),Business, Management and Accounting (miscellaneous)

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Decision-Making Model for Evaluating Joint Venture Contractors in Construction of Complex Infrastructure Megaprojects;Journal of Construction Engineering and Management;2023-09

2. Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam;International Journal of Construction Management;2022-04-22

3. Critical Risks to Construction Cost Estimation;Journal of Engineering, Project, and Production Management;2020-09-08

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3