Abstract
Resource allocation for robust project schedulingThe paper presents a formal description of the resource allocation problem for resource-constrained project scheduling. A schedule can be executed by various resource flow networks which may differ in terms of resistance to disruptions occurring during project execution. The authors define such criteria of evaluating a resource flow network which can be more useful than robustness metrics used so far in the research. The authors discuss the importance of robust scheduling for execution projects and propose metrics for resource allocation robustness which take into consideration the stability of the final schedule. Those metrics make it possible to carry out a more precise analysis concerning the properties of the resource flow network in terms of its robustness to disruptions in comparison with a well known flexibility indicator,flex.
Subject
Artificial Intelligence,Computer Networks and Communications,General Engineering,Information Systems,Atomic and Molecular Physics, and Optics
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献