Use of Meta-Networks to Evaluate Key Agents, Knowledge and Resources in the Planning of Construction Projects

Author:

Śladowski G.1

Affiliation:

1. PhD, Eng., Cracow University of Technology, Faculty of Civil Engineering, Institute of Construction Management

Abstract

AbstractThe article proposes a new approach to the identification of key agents, knowledge and resources required to complete tasks being performed as a part of construction projects. The author used the concept of meta-networks to model the relations between agents, knowledge, resources and tasks of a project. Up until now, the identification of key means of production employed a measure of performance of the project that was modelled using a meta-network. However, this measure is limited as it does not take into consideration the significance of individual tasks or the relations between them. The author thus proposed a structural modification of the performance measure for the purposes of identifying key agents, knowledge and resources of a planned project. A case study analysis has confirmed the application potential of the proposed approach. In practice, the results that were obtained can aid planners in evaluating the performance of a project’s plan. Information about key agents, knowledge and resources can constitute the basis for drafting alternative plans which would be more resistant to failure due to the possible loss of key means of production over the course of carrying out a project.

Publisher

Walter de Gruyter GmbH

Subject

Civil and Structural Engineering

Reference18 articles.

1. Dynamic network analysis for counter - terrorism Unpublished manuscript;Carley,2005

2. Planning the reconstruction of a historical building by using a fuzzy stochastic network in Construction;Radziszewska;Automation,2017

3. Intraorganizational complexity computation The companion to organizations ed a;Carley,2002

4. Enhancing Resilience in Disaster Response Network Analysis Approach In Construction Research Congress;Zhu;Meta,2018

5. Wielowymiarowość problematyki inżynierii przedsięwzięć budowlanych In wyzwania techniki budowlanej Techniki Budowlanej;Kapliński,2017

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3