The Impact of the Magnitude of Overhead Costs on the Difference Between ABC and TDABC Systems

Author:

Tarzibashi Omar Fikrat Fateh1,Ozyapici Hasan1

Affiliation:

1. Eastern Mediterranean University , Faculty of Business and Economics , Famagusta , Mersin 10, Turkey

Abstract

Abstract The objective of this study is to investigate the impact of the magnitude of overhead costs on the results of ABC and TDABC differences. A quantitative research method was used and data were gathered through an extensive literature review. A total of 170 articles that included both ABC and TDABC were found and 37 were used because only 37 articles included both the application of the systems and the comparison of the results of the systems. Correlation analysis and regression analysis were used to test whether there is a relationship between overhead costs and the differences in the results of ABC and TDABC systems. The results indicated that there is a statistically significant relationship between the total amount of overhead cost and the differences in the results of ABC and TDABC systems. Accordingly, when the overhead costs are increased, the TDABC system produces more different results than ABC. Based on this finding, the practical implication of this study seems to portray that companies with high overhead costs using the TDABC system rather than the ABC have the advantage of ascertaining product costing differently, which are more accurate.

Publisher

Walter de Gruyter GmbH

Subject

Strategy and Management

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3