1. Study on the Possibility of Supplying Limestone for Flue Gas Desulfurization at the Kostolac CHP, Nikola Tesla CHP and New Thermal Facilities, Mining Institute and Tekon Belgrade, 2014.
2. Šubaranović, T., Vujić, S., Radosavljević, M., Dimitrijević, B., Ilić, S., and Jagodić Krunic, D., Multi-Attribute Scenario Analysis of Protection of Drmno Open Pit Mine against Groundwater, Journal of Mining Science, 2019, vol. 55, no. 2, pp. 280–286.
3. Vujić, S. and Hudej, M., Multi-Variable Assessment of Risk in Selection of Location and the Way of Open Pit Mines Opening, Proc. of the 5th Balkan Mining Congress, Ohrid, 2013.
4. Amankwah, H., Mathematical Optimization Models and Methods for Open-Pit Mining, Department of Mathematics Linköping University, Linköping, 2011.
5. Baloyi, V.D. and Meyer, L.D., The Development of a Mining Method Selection Model through a Detailed Assessment of Multi-Criteria Decision Methods, Elsevier, Results in Eng., 2020, vol. 8, 72 p.