1. Farrelly, C. and Dimitrakopoulos, R., Recoverable Reserves and Support Effects in Optimizing Open Pit Mine Design, International Journal of Surface Mining, 2002, vol. 16, no. 3.
2. Dowd, P.A., Risk in Minerals Projects: Analysis, Perception and Management, Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 1997, vol. 106.
3. Dimitrakopoulos, R., Farrelly, C.T., and Godoy, M.C., Moving Forward from Traditional Optimization: Grade Uncertainty and Risk Effects in Open-Pit Design, Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 2002, vol. 111.
4. Godoy, M.C., The Effective Management of Geological Risk in Long-Term Production Scheduling of Open Pit Mines, PhD Thesis, The University of Quensland, Brisbane, Qld, Australia, 2003.
5. Godoy, M.C. and Dimitrakopoulos, R., Managing Risk and Waste Mining in Long-Term Production Scheduling, SME Transactions, 2004, vol. 316.