1. Blomer, F. and Gunther, H-O., LP-based Heuristics for Scheduling Batch Processes, Int. J. Product. Res., 2000, vol. 38, no. 5, pp. 1029–1051.
2. Khobotov, E.N., On One Approach to Operation Scheduling of the System for Mixing of Oil Products, Avtom. Telemekh., 2004, no. 9, pp. 168–183.
3. Nott, H.P. and Lee, P.L., An Optimal Control Approach for Scheduling Mixed Batch/Continuous Plants with Variable Cycle Time, Comput. Chemical Eng., 1999, vol. 23, pp. 907–917.
4. Conwey, R.W., Maxwell, W.L., and Miller, L.W., Theory of Scheduling, New York: Addison-Wesley, 1967. Translated under the title Teoriya raspisanii, Moscow: Nauka, 1975.
5. Gornev, V.F., Emel’yanov, V.V., and Ovsyannikov, M.V., Operativnoe planirovanie v GPS (Scheduling in Flexible Manufacturing Systems), Moscow: Mashinostroenie, 1990.