Subject
Applied Mathematics,Industrial and Manufacturing Engineering
Reference14 articles.
1. L. Weiss, “On the Controllability of Delay Differential System,” SIAM J. Control. 5(4), 575–587 (1967).
2. A. V. Metelskii, ”Problems of the Pointwise Completness in the Control Theory of Differential-Difference Systems,“ UspekhiMat. Nauk 49(2/296), 103–140 (1994).
3. R. M. Brooks and K. Schmitt, “Pointwise Completeness of Differential-Difference Equations,” Rocky Mountain J. Math. 3(3), 11–14 (1973).
4. A. M. Zverkin, “Pointwise Completeness of the Systems with Delay,” Differentsial’nye Uravneniya 9(3), 430–436 (1973) [Differential Equations 9 (1973), 329–334 (1975)].
5. V. M. Popov “Pointwise Degeneracy of Linear, Time-Invariant, Delay-Differential Equations,” J. Differential Equations 11(3), 541–561 (1972).