Author:
Kononova P. A.,Kochetov Yu. A.
Subject
Applied Mathematics,Industrial and Manufacturing Engineering
Reference25 articles.
1. Research Report No.;J R Jackson,1955
2. W. E. Smith, “Various Optimizers for Single-Stage Production,” Naval Res. Logist. Quart. 3 (1–2), 59–66 (1956).
3. L.-P. Bigras, M. Gamache, and G. Savard, “The Time-Dependent Traveling Salesman Problem and Single Machine Scheduling Problems with Sequence Dependent Setup Times,” Discrete Optim. 5 (4), 685–699 (2008).
4. A. Allahverdi, “The Third Comprehensive Survey on Scheduling Problems with Setup Times/Costs,” European J. Oper. Res. 246 (2), 345–378 (2015).
5. B. Chen, C. N. Potts, and G. J. Woeginger, “A Review of Machine Scheduling: Complexity, Algorithms, and Approximability,” in Handbook of Combinatorial Optimization, Vol. 3 (Kluwer Acad. Publ., Dordrecht, 1998), pp. 21–169.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献