1. Capital Cost and Performance Characteristic Estimates for Utility Scale Electric Power Generating Technologies (Independent Statistics & Analysis, U.S. Energy Information Administration, U.S. Department of Energy, Washington, DC, 2020).
2. Georgia Power Company’s Seventeenth Semi-Annual Construction Monitoring Report, Request for Approval of the Expenditures Made between January 1, 2017 and June 30,
2017, and Request for Approval of the Revised Project Cost Estimates and Construction Schedule Pursuant To O.C.G.A. § 46-3a-7(b) (Georgia Power Company, Atlanta, Ga., 2017). https://cleanenergy.org/wp-content/uploads/17VCM_report_083117.pdf
3. R. Walton, “Vogtle cost upgrade causes rethinking of $25B nuclear plant’s future,” Power Eng., Aug. 9 (2018). https://www.power-eng.com/nuclear/new-projects-nuclear/vogtle-cost-upgrade-causes-rethinking-of-nuclear-plant-s-future
4. V. M. Boldyrev, M. E. Voronkov, N. M. Sinev, and V. M. Chakhovskii, “Load-following nuclear power stations with heat accumulators,” At. Energy 51, 555–559 (1981).
5. V. M. Chakhovskii and K. I. Soplenkov, “Let’s save? Energy efficiency of heat storage systems in nuclear power industry,” Rosenergoatom, No. 2, 20–25 (2010).