1. Veretenova, T.A., Vokin, V.N., and Kislyakov, V.E., Planning the Hauling Operations at the Mine Based on the Automation of the Queuing System Parameters Calculation, Marsheider. Nedropol’z., 2011, no. 2, pp. 54–57.
2. Kurolov, A.A., Formation of Transportation System in Open Pit Mines Using Mobile Crushing–Loading Units, Theses Cand. Tech. Sci., Moscow: MGGU, 2007.
3. Molotilov, S.G., Cheskidov, V.I., and Norri, V.K., Methodical Principles for Planning the Mining and Loading Equipment Capacity for Open Cast Mining with the Use of Dumpers. Part I, J. Min. Sci., 2008, vol. 44, no. 4, pp. 376–385.
4. Molotilov, S.G., Cheskidov, V.I., Norri, V.K., and Botvinnik, A.A., Methodical Principles for Planning the Mining and Loading Equipment Capacity for Open Cast Mining with the Use of Dumpers. Part II: Engineering Capacity Calculation, J. Min. Sci., 2009, vol. 45, no. 1, pp. 43–58.
5. Rzhevsky, V.V., Otkrytye gornye raboty. Ch. 2: Tekhnologiya i kompleksnaya mekhanizatsiya (Open Pit Mining. Part 2: Technology and Integrated Mechanization), Moscow: Nedra, 1985.