1. Burger, K.E. and Ericsion, E., The Optimization of Coal Mine Production Schedules Using Linear Programming: An Example That Determines the Effects of Reclamation Costs and Interest Rates, Mining Sci. and Technol., 1984, no. 1.
2. Lizotte, Y. and Elbrond, J., Choice of Mine-Mill Capacities and Production Schedules Using Open-Ended Dynamic Programming, CIM Bull., 1982, vol. 75, March.
3. Corbyn, J.A., Optimum Life of a Resource Depleting Project, Mining Engineering, 1985, no. 3.
4. Sturgul, J. R., Optimum Life of Mine: Declining Production Case, Int. J. Mining Engineering, 1985, no. 3.
5. Li, Z., A Theoretical Approach to Determination of Mine Life and Design Capacity, Int. J. Surf. Mining, 1989, nol. 3.