1. Ivannikov, V.I., Mudding and Demudding of Well Bottom Zone, Geolog., Geofiz., Razrab. Neft. Gaz. Mestorozhd., 2011, no. 4, pp. 56–60.
2. Nasybullin, A.V. and Voikin, V.F., Determination of Fluid Flow Rate in a Horizontal Well in the Steady-State Mode in a Flooding Element, Georesursy, 2015, no. 1(60), pp. 35–38.
3. D’yachuk, I.A., Assessment of Residual Oil Accumulation Rate in Idle Highly Watercut Wells, Georesursy, 2015, no. 1(60), pp. 70–78.
4. Erofeev, A.A. and Mordvinov, V.A., Alteration of Well Bottom Zone Properties in the Course of the Bobrikovskaya Pool Development in the Unvin Oil Filed, Vestn. PNIPU. Geolog. Neftegaz. Gorn. Delo, 2012, pp. 57–62.
5. Suleimanov, B.A., Bairamov, M.M., and Mamedov, M.R., Planning Acid Treatment in Horizontal Wells, Neftepromysl. Delo, 2004, no. 9, pp. 45–48.