1. Dimitrakopoulos, R., Farrely, C., and Godoy, M., Moving Forward from Traditional Optimization: Grade Uncertainty and Risk Effects in Open Pit Mine Design, Transactions of the IMM, Section A Mining Industry, 2002, vol. 111.
2. Ravenscroft, P., Risk Analysis for Mine Scheduling by Conditional Simulation, IMM Transactions, Mining Technology, 1992, vol. 101.
3. Dowd, P., Risk in Mineral Projects: Analysis, Perception and Management, IMM Transactions, Mining Industry, 1997, vol. 106.
4. Godoy, M., The Effective Management of Geological Risk in Long-term Production Scheduling of Open Pit Mines, PhD Thesis, University of Queensland, Brisbane, Australia, 2003.
5. Dimitrakopoulos, R., Stochastic Optimization for Strategic Mine Planning: a Decade of Developments, Journal of Mining Science, 2011, vol. 47.