1. V. S. Nevzgodin, “Problems of modernization and reconstruction of thermal and hydroelectric power plants,” Akad. Energ. 42 (4), 78–82 (2011).
2. V. F. Rezinskikh, “Deadline for the operation of thermal power plant equipment,” Elektr. Stn., No. 6, 13–17 (2011).
3. V. N. Artemov, A. V. Klimenko, V. V. Klimenko, and A. G. Tereshin, “Comparative analysis of thermal power engineering effectivesness of Russia and other world countries,” Vestn. Mosk. Energ. Inst., No. 1, 9–15 (2013).
4. M. Kupetz, E. Jenikejew, and F. Hiss, “Modernization and life time extension on steam power plants in Eastern Europe and Russia,” Therm. Eng. 61, 417–424 (2014). doi 10.1134/S0040601514060056
5. A. A. Makarov, E. A. Volkova, F. V. Veselov, A. S. Makarova, L. V. Urvantseva, and N. V. Bobyleva, “Prospects of the development of electricity generation capacities in Russia,” Therm. Eng. 55, 98–111 (2008).