Publisher
Instituto Brasileiro de Petroleo e Gas
Reference22 articles.
1. Basseto, S., Siadat, A., & Tollenaere, M. (2011). The management of process control deployment using interactions in risks analyses. Journal of Loss Prevention in the Process Industries, 24(4), 458–465.
2. Cai, J., Li, X., & Yang, G. (2011). The Risk Priority Number methodology for distribution priority of emergency logistics after earthquake disasters (pp. 560–562). Presented at the Management Science and Industrial Engineering (MSIE), Harbin, China.
3. Fogliatto, F. S., & Ribeiro, J. L. D. (2009). Confiabilidade e manutenção industrial. Rio grande do sul: GEN LTC.
4. Greenberg, J. (2009). Improved Top drive systems boosts reliability, push capacity limits. Retrieved from https://www.drillingcontractor.org/improved-top-drive-systems-boost-reliability-push-capacity-limits-1349
5. Horenbeek, A. V., Pintelon, L., & Muchiri, P. (2010). Maintenance optimization models and criteria. International Journal of Systems Assurance Engineering and Management, 1(3), 189–200. https://doi.org/10.1007/s13198-011-0045-x