1. [1]. Li, Y., “Developing a sustainable construction waste estimation and management system.,” Thesis,
Hong Kong University of Science and Technology, Hong Kong., April, 2013.
2. [2]. Tam, V. W., Shen, L. Y., & Tam, C. M., “Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations,” Building and environment, 42(3), pp. 1471-1477, 2007.
3. [3]. United Nations Environment Programme (UNEP). “Solid Waste Management”, Vol. I, ISBN: 92-807-2676-5., 2005.
4. [4]. Ministry of Environment and Urbanization., “National Waste Management and Action Plan 2023,” 2017, Available:https://webdosya.csb.gov.tr/db/cygm/haberler/ulusal_at-k_yonet-m--eylem_plan--20180328154824.pdf. ,(accessed 24 January 2020)
5. [5]. Turkish Court of Accounts., “National Regulations and Waste Management in Turkey, Evaluation of Implementation Results Performance Audit Report,” 2007, Available: https://docplayer.biz.tr/29224-T-c-sayistay-baskanligi-turkiye-de-atik-yonetimi-ulusal-duzenlemeler-ve-uygulama-sonuclarinin-degerlendirilmesi-performans-denetimi-raporu.html., (accessed 04 January 2020)