Author:
Chen James C.,Huang PoTsang B.,Peng Hui-Yu,Hung Ming-Chien,Chen Chih-Cheng,Peng Tzu-Wei,Wei Yu-Yao,Feng Chao-Hsuan
Reference10 articles.
1. Impact of production control and system factors in semiconductor wafer fabrication;Chao;IEEE Transactions on Semiconductor Manufacturing,2008
2. Effective Order Assignment for Color Filter Fabs;Chen;SID Symposium Digest,2009
3. Release Planning for Color Filter Fabs Based on Iterative Simulation;Chen;SID Symposium Digest,2010
4. Capacity Planning of Serial and Batch Machines with Capability Constraints for Wafer Fabrication Plants;Chen;International Journal of Production Research,2010
5. J.C. Chen P.B. Huang C.J. Sun K.J. Chao G.C. Chao J.W. Chien C.C. Chen C.N. Mo T.W. Peng Y.Y. Wei C.H. Feng Y.C. Liu M.T. Chiang “Simulation Modeling of TFT-LCD Color Filter Fab,” 2009