Prospective Elective Neurosurgical Theater Utilization Audit in Pakistan: Problems in a Public Tertiary Care Hospital and Proposed Solutions from Lower-Middle-Income Country

Author:

Ashraf Mohammad12,Kamboh Usman Ahmad2,Raza Muhammad Asif2,Khan Muhammad Irfan2,Sultan Kashif Ali2,Choudhary Nabeel2,Hussain Syed Shahzad2,Ashraf Naveed2

Affiliation:

1. Wolfson School of Medicine, University of Glasgow, Glasgow, Scotland, United Kingdom

2. Department of Neurosurgery, Allama Iqbal Medical College, Jinnah Hospital, Lahore, Pakistan

Abstract

Abstract Background In lower-middle-income countries such as Pakistan, public hospitals provide free healthcare but suffer from poor management and misgovernance, negatively impacting service provision. One aspect of this is operating theater time (OTT) utilization. In a 1,600-bed hospital with a 22 million catchment population, we noticed significant delays and inadequate OTT efficiency at the neurosurgery department of Jinnah Hospital, Lahore, Punjab, Pakistan. This audit aimed to analyze the neurosurgical OTT utilization, identify delays, and highlight managerial deficiencies and areas for improvement while comparing our workflow with contemporary international literature. Materials and Methods We prospectively audited OTT utilization at the neurosurgical department. All elective surgeries from January to April 2021 were included to identify delays concerning patient transfer, anesthesia team arrival, preparation and intubation time, operative time, and anesthesia extubation time. Results Fifty-six per cent of OTT was utilized operating. Sources of delay included the delayed arrival of anesthesia team (4.7%) and the delay in transferring patients to OT (9.7%). Anesthesia intubation and preparation time accounted for 23% of OT utilization and was significantly longer than the comparable international studies. Extubation time accounted for 5.7% of OT utilization. The issues surrounding transfer delays and prolonged anesthesia time were discussed, with strategies to address them developed with close vital input from our anesthesia colleagues and ward staff. Conclusion Gross delays relatively simple in nature were identified due to poor management and less than ideal interspecialty coordination. Most delays were avoidable and can be addressed by proper planning, optimization of patient transfer and resources, and, most importantly, improved communication between surgeons, anesthetists, and ward staff. This can ensure optimal use of theater time and benefit all specialties, including ancillary staff, and, most importantly, the patient. A reaudit is warranted to assess the impact of interventions on OTT utilization.

Publisher

Georg Thieme Verlag KG

Reference16 articles.

1. The role of clinical audit in clinical governance;B Levy;Surgery,2009

2. Surgery, public health, and Pakistan;S N Zafar;World J Surg,2011

3. Evaluating quality standards' adherence in surgical care: a case study from Pakistan;I Fatima;Int J Qual Health Care,2018

4. Challenges faced by Pakistani healthcare system: clinician's perspective;F Khalid;J Coll Physicians Surg Pak,2018

5. A critical analysis of the current state of neurosurgery training in Pakistan;M S Shamim;Surg Neurol Int,2011

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3