Engineering project control of comprehensive unit price fluctuation-time limit fluctuation-process adjustment

Author:

Nie Xiangtian123,Shi Jianyou1,Wang Bo123,Cui Zhirui4

Affiliation:

1. School of Water Conservancy, North China University of Water Resources and Electric Power, Zhengzhou, Henan, China

2. Collaborative Innovation Center of Water Resources Efficient Utilization and Support Engineering, Zhengzhou, Henan, China

3. Henan Key Laboratory of Water Environment Simulation and Treatment, Zhengzhou, Henan, China

4. School of Materials Science and Engineering, North China University of Water Resources and Electric Power, Zhengzhou, Henan, China

Abstract

When an engineering project requires a lot of time and the construction environment is complex, the unit price of materials and personnel will change, the project construction will be hindered, and the construction plan of the project should be adjusted. These uncertain interference factors will cause the earned value analysis results are quite different from or even contrary to the actual situation, so there will not be enough impartial data to help managers to control project. To this end, this paper analyzes how the price fluctuations, process adjustment and the abnormal construction period will affect the construction schedule and cost effect respectively, and further studies the corresponding methods of earned value correction. Based on case analysis, this paper studies the comprehensive correction method of earned value when cost unit price changes, working procedure is adjusted and construction period fluctuates in an abnormal manner. The method improves the theory of earned value and provides reference for engineering practices on project management.

Publisher

IOS Press

Subject

Computational Mathematics,Computer Science Applications,General Engineering

Reference16 articles.

1. Assessing the performance of construction projects: Implementing eared value management at the General Services Administration;Alvarado;Journal of Facilities Management,2005

2. Designing a control mechanism using earned value analysis: An application to production environment;Bagherpour;International Journal of Advanced Manufacturing Technology,2010

3. Dynamic cost control of construction project based on modern control theory;Kang;Hydropower Generation,2013

4. Prediction of project outcome – The application of statistical methods to earned value management and earned schedule performance indexes;Lipke;International Journal of Project Management,2009

5. Probabilistic forecasting of project duration using Kalman filter and the earned value method;Byung-Cheol;Journal of Construction Engineering and Management,2010

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3