Abstract
Purpose: To solve the problems of low integration accuracy and long integration time of traditional prefabricated construction information integration methods. Method: A method of assembling building information integration based on BIM and RFID technology was proposed. By analyzing the information integration principle of BIM RFID (Building Information Modeling Radio Frequency Identification) technology, starting with rfid technology, we use rfid technology to collect the information of prefabricated building components and obtain the coding information of component data. Experiment: Combining Markov model and fuzzy algorithm, the obtained coding information is preprocessed. According to the processing results, statistical feature clustering algorithm is introduced to integrate the construction information of prefabricated buildings. Result: The precision polyline of the prefabricated building construction information integration method based on BIM and RFID technology showed a steady increase, and it was close to 100% in the later stage. At the same time, the time consumed by this method was within 0.41 s, with high accuracy, high efficiency and high practicability.
Subject
Computational Mathematics,Computer Science Applications,General Engineering
Reference18 articles.
1. Integrated design and installation dry construction technology of prefabricated building integrated ground;Wu;China Constr Met Struct.,2021
2. Chen ZB. Discussion on the application of integrated climbing frame technology in prefabricated buildings. Pet Petrochem Mater Procur. 2019; (34): 17.
3. Gao X, Yu YS, Li Y. Research on information integration of construction project management based on BIM. IOP Conf Ser Earth Environ Sci. 2019; 267(3): 32069-32069.
4. Integration of facility management and building information modeling (BIM);Dixit;Facil.,2019
5. Development and application of BIM+SolidWorks integration technology in prefabricated building construction;Hu;Build Struct.,2021