A scenario-based mathematical approach to a robust project portfolio selection problem under fuzzy uncertainty

Author:

Karimi Saeed1,Mirzamohammadi Saeed1,Pishvaee MirSaman1

Affiliation:

1. Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran

Abstract

As a major concern of chief managers in each organization, project portfolio selection has a special place in their responsibilities. To assist managers in making decisions, applicable optimization models play an essential role in such processes. In this regard, this paper provides a stochastic optimization model for a project portfolio selection problem under different scenarios. Providing the novelty in the model along with making it closer to reality, the interdependency between revenue and cost of projects is considered. Due to the inherent uncertainty of parameters, the revenue and cost of each project, as well as contributed capital, follow triangular fuzzy parameters. Contrary to the previous model, the appreciation of assets is considered in the proposed model as the other novelty of the proposed model. To tackle the uncertainty of parameters, a robust possibilistic approach is used, which has been first-ever devised in such problems. Being both optimistic and pessimistic approaches available for decision-makers, a new measure is introduced to make the model inclusive. Moreover, by considering the confidence level as both parameter and decision variables, the robust possibilistic programming approach is adopted to solve the proposed model. Using the new proposed measure, the optimal average value of robust model are obtained under different confidence level. Finally, solving the optimization model, the results are provided by implementing the realization for uncertain parameters, and regarding the obtained results, discussions are made to provide some insights to the managers.

Publisher

IOS Press

Subject

Artificial Intelligence,General Engineering,Statistics and Probability

Reference32 articles.

1. A multi objective-BSC model for new product development project portfolio selection;Abbasi;Expert Systems with Applications,2020

2. An integrated framework for project portfolio selection;Archer;International Journal of Project Management,1999

3. Capital budgeting problems with fuzzycash flows;Carlsson;Mathware and Soft Computing,1999

4. Project selection, scheduling and resource allocation with time dependent returns;Chen;European Journal of Operational Research,2009

5. A two-stage fuzzy approach for Industry 4.0 project portfolio selection within criteria and project interdependencies context;Demircan Keskin;Journal of Multi-Criteria Decision Analysis,2020

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3