The risk evaluation of PPP projects: A technique based on probabilistic linguistic terms with weakened hedges

Author:

Lina Wang1,Zeshui Xu12

Affiliation:

1. School of Economics and Management, Southeast University, Nanjing, Jiangsu, China

2. School of Business, Sichuan University, Chengdu, Sichuan, China

Abstract

Risk management is a significant part of the success of a public-private partnership (PPP) project. There are four phrases for the process of risk management: Constructing a risk management environment, identifying risk factors, evaluating risk factors, and allocating risk factors. After identifying risk factors, it is imperative to analyze and evaluate critical risk factors, which can help participants formulate strategies to allocate risk factors, and thus alleviate the possible adverse results. The objectives of analyzing and evaluating risk factors focus on two aspects: The possibilities of risk occurrence and the degrees of risk loss. On behalf of determining the critical risk factors effectively, we take the probability degree and linguistic expressions into consideration to manifest experts’ perspectives. We consider critical risk factors in terms of the probabilistic linguistic terms with weakened hedges from the evidential reasoning approach view. The linguistic terms with weakened hedges are applied to express the degree of risk risk loss, and the possibilities of risk occurrence collect from the probabilities of linguistic terms with weakened hedges. First, the commonality function and plausibility function are applied to correct the possibilities of risk occurrence for linguistic terms with weakened hedges. Next, we build a risk evaluation model from experts’ risk propensity and risk perceptions. Moreover, a case study of the risk analyzing and evaluating process of a PPP project is applied to illustrate the availability and effectiveness of the proposed model. We contrast the introduced model with other approaches. Finally, the advantages of this model intend to improve the linguistic terms with weakened hedges for the probabilistic linguistic terms with weakened hedges and evaluate risk factors considering the evidence reasoning approach.

Publisher

IOS Press

Subject

Artificial Intelligence,General Engineering,Statistics and Probability

Reference47 articles.

1. Evaluation and ranking of risk factors in transnational public–private partnerships projects: case study based on the intuitionistic fuzzy analytic hierarchy process;Yu;Journal of Infrastructure Systems,2018

2. Preferred risk allocation in Chinas public–private partnership (PPP) projects;Ke;International Journal of Project Management,2010

3. Successful delivery of public-private partnerships for infrastructure development;Abdel;Journal of Construction Engineering and Management,2007

4. Infrastructure Project Risk Management;Wang;Beijing: China Building Industry press,2010

5. An evidential reasoning approach for multiple-attribute decision-making with uncertainty;Yang;IEEE Transactions on Systems Man and Cybernetics,1994

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3