Abstract
The construction process and construction management are highly reliant on the interaction between the triple constraints of project management of quality: scope, time, and cost. The industry has incorporated certain principles and technology, such as lean-based construction principles and Building Information Modeling (BIM), to maximize the time, quality, and cost-efficiency of various construction projects. Analysis and assessment of the factors and functionalities are needed to show their synergic relationships and determine their significant impact on the construction project using Structural Equation Modeling (SEM). To gather information, a survey was conducted on the different construction companies in the Philippines. The results generated a model interrelating the triple constraints of project management and how they are affected by incorporating BIM and lean construction principles. The models created established a significant relationship towards all the tripe constraints considering both individual and combined functionalities and factors. An interdisciplinary framework incorporating both BIM and lean principles is conformed to optimize construction stages based on the triple constraints of project management.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献