A cognitive map integrated intuitionistic fuzzy decision-making procedure for provider selection in project management

Author:

Dursun Mehtap1,Goker Nazli1,Mutlu Hakan1

Affiliation:

1. Department of Industrial Engineering, Galatasaray University, Ortakoy, Istanbul, Turkey

Abstract

Organizations make use of project management methodologies, which provide an effective manner to achieve managerial goals, maintain the strength of the companies in increasing competition. Efficiency in planning, budgeting, and scheduling are provided so that high quality outputs are obtained through these processes. Agile project management methodology, which has been emerged from unpredictability of customer requirements and changeable business environment, is apt to cope with the failures of traditional project management tools. Besides, lean six-sigma project management methodology has become a combination of lean and six-sigma, which were opponent methodologies previously. This paper aims to determine the most suitable outsourcing provider alternative by presenting a novel cognitive maps-based intuitionistic fuzzy decision making procedure. Interrelationships among evaluation criteria are weighted employing intuitionistic fuzzy cognitive map technique because of the causal links among evaluation criteria, vagueness, fuzziness, and hesitation in data. Moreover, the most appropriate provider alternative for both agile and lean six-sigma project management methodologies is identified by utilizing intuitionistic fuzzy TOPSIS method, which aims for minimizing the closeness to the ideal solution while maximizing the distance from the anti-ideal solution in hesitative environment. The case study is carried out in a bank that performs in Turkish banking sector.

Publisher

IOS Press

Subject

Artificial Intelligence,General Engineering,Statistics and Probability

Reference37 articles.

1. Results Kurumsal Verimlilik Çözümleri: Yalın AltıSigma / Beyaz Kuşak Eğitimi (2010).

2. A statistical analysis of the effects of Scrum and Kanban on software development projects;Lei;Robotics and Computer-Integrated Manufacturing,2017

3. Selecting a project’s methodology;Cockburn;IEEE Software,2000

4. Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling;Lova;Annals of Operations Research,2001

5. Software project management using PROMPT: A hybrid metrics, modeling and utility framework;Raffo;Information and Software Technology,2005

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3