1. [1]Demonstration development project, plant operational flexibility, EPRI, Palo Alto, CA, 2012, 1024639.
2. [2]Impact of cycling on the operation and maintenance cost of conventional and combined-cycle power plants, EPRI, Palo Alto, CA, 2013, 3002000817.
3. [3]Flexible operations in fossil plants, EPRI, Palo Alto, CA, 2013, 3002000045.
4. [4]ASME, Rules for the construction of nuclear facility components, Class 1 components in elevated temperature service, boiler and pressure code, Section III, Division 1 – Subsection NH, 2001.
5. [5]TRD 301, Annex I – Design: calculation for cyclic loading due to pulsating internal pressure or combined changes of internal pressure and temperature, in: Technical Rules for Steam Boilers, 1978.