Construction period and cost optimization for river dredging engineering based on NSGA-II

Author:

Yang Yong

Abstract

To improve the economic benefits of river dredging engineering construction, studies have been undertaken to optimize construction period costs. This study suggests a scheme for optimizing schedule costs through the use of three algorithms: non-dominated sorting genetic algorithm with elite strategy, simulated annealing colony algorithm, and ant colony algorithm. To achieve the preliminary algorithm selection of construction duration cost, the objectives have single and multi-objective, and iterative models are constructed separately. The validation results showed that the simulated annealing algorithm achieved the optimal solution in single objective optimization after the 81st iteration. The optimal solution of genetic algorithm in multi-objective optimization was a construction period of 49 days and a cost of 1788.15 million yuan. The non-dominated algorithm reduced the construction period to 313 days, which can save 52 days of construction period and reduce costs by 52.32 million yuan. This optimization algorithm has high efficiency in predicting shorter construction periods and lower costs, and has strategic foresight in the decision plans of decision-makers.

Publisher

IOS Press

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3