Directed earned value management based on ordered fuzzy numbers

Author:

Mortaji Seyed Taha Hossein1,Noori Siamak1,Bagherpour Morteza1

Affiliation:

1. Department of Industrial Engineering, Iran University of Science and Technology, Narmak, Tehran, Iran

Abstract

Earned value management is well-known as the most efficient method of project monitoring and control providing relatively reliable information about the project performance. However, this method requires accurate estimates of the progress of project activities, which are always associated with uncertainties that, if ignored or not addressed well, lead to incorrect results. To address this issue, the application of multi-valued logic, in particular fuzzy logic, in earned value management has recently attracted a lot of attention both in practice and research. This paper introduces directed earned value management (DEVM) in which ordered fuzzy numbers are used to express the so-called uncertainties as well as to capture more information about the trend of the project progress. To evaluate the performance of the proposed method, several numerical examples and a case study are presented. The results reveal that compared to the existing methods, DEVM has a lower computational complexity. Also, it doesn’t suffer from the overestimation effect and as a result, it has a higher ability to express project-specific dynamics. In sum, the proposed method allows project managers to make informed decisions that lead to taking preventive and corrective actions promptly and at a lower cost.

Publisher

IOS Press

Subject

Artificial Intelligence,General Engineering,Statistics and Probability

Reference44 articles.

1. Project Management Institute, A guide to the project management body of knowledge, Newtown Square: Pa: Project Management Institute (2017).

2. On uncertainty, ambiguity, and complexity in project management;Pich;Management Science,2002

3. Kerzner H. , Project management: a systems approach to planning, scheduling, and controlling, John Wiley & Sons (2017).

4. Fleming Q.W. , Koppelman J.M. , Earned Value Project Management, Newtown Square: Project Management Institute (2010).

5. SCOPE: (Schedule, cost, performance) planning and control system;Hochwald;IEEE Transactions on Engineering Management,1966

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Explainable machine learning for project management control;Computers & Industrial Engineering;2023-06

2. Cost Early-Warning Model System of Large-Scale Construction Project;Computational Intelligence and Neuroscience;2022-05-10

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3