Abstract
Distributed generation (DG) improves the reliability of the system by providing a means of alternate power supply to the load points. DG is integrated to meet the system load along with the utility. In this work roy billinton test system (RBTS) bus 4 is considered for evaluating the effect of DG integration on system reliability. Reliability is evaluated using failure modes and effect analysis (FMEA) technique and the results are validated using Monte Carlo simulation technique. A MATLAB program is developed for both the techniques to evaluate the reliability. The failure rate of DG and the islanding capability of the DG are considered to resemble the practical operating conditions of DG. When DG is operating in islanded mode, if DG fails it affects the outage time of the load points. DG failure rate is also considered as the second order failure event overlapping with the feeder section failures. All the practical operating conditions of DG considered and their effect on the reliability of the system is evaluated.
Publisher
Institute of Advanced Engineering and Science
Subject
Electrical and Electronic Engineering,Control and Optimization,Computer Networks and Communications,Hardware and Architecture,Instrumentation,Information Systems,Control and Systems Engineering,Computer Science (miscellaneous)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献