1. Xie, G.H. and Chen, W.R. (2020) Underwater Cutting Technology of Old Bridge Pile Foundation. Highway, 65, 180-184.
2. Liu, Z.J., Lei, B. and Ye, K. (2018) Modular Demolition of Large Reinforced Concrete Walls by Rope Saw Method. Construction Technology, 47, 1145-1149.
3. Xie, S.L. and Ma, Z.F. (2018) Construction of Temporary Consolidation System and Rope Saw Removal Technology for Large-Span Continuous Girder Bridges. Highway Engineering, 43, 131-135.
4. Ma, X.W. (2022) Construction Measurement Technology for Jacking of Large-Section Inclined Box Bridges under the Longhai Railway. Railway Construction Technology, 4, 118-122.