1. Chemezov, D. A. Harmonic analysis of a statically indeterminate frame [Garmonicheskiy analiz strategicheski neopredelimoi ramy]. Molodoi ucheniy, 2014, Iss. 12 (71), pp. 122–127. [Electronic resource]: https://moluch.ru/archive/71/12203. Last accessed 14.03.2023.
2. Verigo, M. F., Kogan, A.Ya. Interaction of track and rolling stock [Vzaimodeistvie puti i podvizhnogo sostava]. Ed. by M. F. Verigo. Moscow, Transport publ., 1986, 559 p. [Electronic resource]: https://lokomo.ru/zheleznodorozhnyyput/vzaimodeystvie-puti-i-sostava.html. Last accessed 14.03.2023.
3. Vlasov, G. M., Shirokov, Yu. M., Yashnov, A. N. Methodology and some results of experimental studies of the work of the slab of the ballast container of reinforced concrete span structures [Metodika i nekotorie rezultaty eksperimentalnykh issledovanii raboty plity ballastnogo koryta zhelezobetonnykh proletnykh stroenii]. Improving reliability and efficiency of railway transport. Abstracts of reports. Novosibirsk, Novosibirsk Institute of Railway Engineers, 1988, pp. 5–11.
4. Chernyshev, M. A. Practical methods for track calculation [Prakticheskie metody rascheta puti]. Moscow, Transport publ., 1967, 235 p. [Electronic resource]: https://rusneb.ru/catalog/000200_000018_rc_4792595/. Last accessed 14.03.2023.
5. Shakhunyants, G.M.Railway track [Zheleznodorozhniy put]. Moscow, Transport publ., 1987, 479 p. [Electronic resource]: https://vtome.ru/knigi/tehnika/453305‑zheleznodorozhnyj-put‑1987.html. Last accessed 14.03.2023.