What to avoid when you are implementing a BSC? From success to failure

Author:

Banchieri Lucía-Clara1,Campa-Planas Fernando2,Victoria Sánchez-Rebull Maria2

Affiliation:

1. Ph.D., Universidad Nacional del Sur (Bahía Blanca – Argentina), Argentina

2. Ph.D., Senior Lecturer, Universitat Rovira i Virgili (Reus – Spain), Spain

Abstract

Approximately 20 years after the creation of the Balanced Scorecard (hereinafter BSC), BSC is the sixth most widely used management tool by organizations (Rigby and Biledau, 2011). The aim of this article is to identify the key factors for the implementation of a BSC in organizations. To do so, the authors analyzed two cases BSC implementation: one a success and the other a failure. The findings were classified by the answers to the following questions: What was implemented? Where was it implemented? Who implemented it? How did they implement it? and Why was it implemented? The four key factors for the successful implementation of the BSC identified in this study, which complement the existing literature on this subject, are: previous experience of the people responsible for the project; linking the BSC to available resources; consistency between the organizational structure and the strategy; and finally, carrying out a pilot test. Purpose: Approximately 20 years after the creation of the Balanced Scorecard (hereinafter BSC), BSC is the sixth most widely used management tool by organizations (Rigby and Biledau, 2011). The aim of this article is to identify the key factors for the implementation of a BSC in organizations. Design/methodology/approach: The methodology used for this research was the case study, specifically the “two case” study method (Yin, 2003). The cases were selected as being extremes: one organization that had successfully implemented a BSC, and a company whose implementation failed. The findings were classified by the answers to the following questions: What was implemented? Where was it implemented? Who implemented it? How did they implement it? and Why was it implemented? Findings: The four key factors for the successful implementation of the BSC identified in this study, which complement the existing literature on this subject, are: previous experience of the people responsible for the project; linking the BSC to available resources; consistency between the organizational structure and the strategy; and finally, carrying out a pilot test. Originality/value: The contribution made by this study consists of identifying additional key factors that may affect the success or failure of implementing BSC in an organization

Publisher

LLC CPC Business Perspectives

Subject

Strategy and Management,Business and International Management,General Business, Management and Accounting,Information Systems and Management,Law,Sociology and Political Science,Public Administration

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Relevance of a New Perspective of Social Responsibility and Sustainability in the Balanced Score Card;Handbook of Research on Promoting an Inclusive Organizational Culture for Entrepreneurial Sustainability;2022-10-28

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3