1. 1) Shih N. and Wang P. : Point Cloud Based Comparison between ConstructionSchedule and AsBuilt Progress: LongRange ThreeDimensional Laser Scanner's Approach, Journal of Architectural Engineering, pp. 98-102, 2004.
2. 2) Shih N. and Huang S. : 3D Scan Information Man-agement System for Construction Management, Journal of Construction Engineering and Manage-ment, pp. 134-142, 2006.
3. 3) Miller P. E., Mills J. P., Barr S. L., Lim M., Barber D., Parkin G. and Clarke B., Glendinning S. and Hall J. : Terrestrial laser scanning for assessing therisk of slope instability along transport corridors, XXIst ISPRS Congress:Commission V, WG 3, Beijing, pp. 495-500, 2008.
4. 4) Watson C., Chen S., Bian H., and Hauser, E. : LiDAR Scan for Blasting Impact Evaluation on a Culvert Structure, Journal of Performance of Constructed Facilities, (ASCE) CF.1943-5509.0000318., 2011.
5. 5) R. Pitto : A Solution to the Next Best View Problem for Automated SurfaceAcquisition, IEEE Trans. PA MI, Vol 21. No. 10, pp. 1060-1030, 1999.