Time and Motion Studies of Manual Harvesting Methods for Oil Palm Fruit Bunches: A Malaysian Case Study

Author:

Saibani Nizaroyani,Muhamed Ariff Azly,Maliami Mohd Faizal,Ahmad Rasyidah

Abstract

In optimizing the yield of oil palm fruit bunches collection, the mechanization of the collection process is very important. However, before the analysis of the cost benefits of any mechanization development can be utilized, this study has to be carried out. Time and Motion Studies (TMS) is used to identify and measure the efficiency of the oil palm fruit bunches’ manual harvesting technique. The Direct Time Study Technique has been selected to determine and record the time taken by the harvester to harvest the oil palm fruit bunches, where the tool used in this technique is a stopwatch, alongside the Time Study Observation Sheet. Meanwhile, to examine the motions used by the harvester in the harvesting process, the Therblig’s Motion Principle is applied to identify effective and non- effective motions. A field work study has been conducted by monitoring two harvesters and all the real time data is recorded in the time study observation sheet and analyzed to get a value of Normal Time (NT) and also Standard Time (ST) for each work element involved in the manual harvesting process of palm oil. There are seven work elements that have been identified to have been used by the harvester to complete the process, the first element  is searching for the mature palm oil tree (NT= 40.73 seconds), the second element  is adjusting the Aluminium Pole and Knife (APK) cutter (NT= 23.36 seconds), the third element is cutting the oil palm’s frond (NT= 51.30 seconds), the fourth element is cutting  the mature oil palm’s bunches (NT= 60.26 seconds), the fifth element is collecting the oil palm’s frond that  has been cut (NT= 21.69 seconds), the sixth element is putting the oil palm’s bunches that have been cut  into the wheel barrow (NT= 34.25 seconds) and the seventh element  is collecting the loose oil palm fruits or called fruitlets (NT= 77.49 seconds). The study also categorized a few non-effective work elements carried out during the manual harvesting process. The elements are: searching for the oil palm trees that have mature oil palm bunches, adjusting the APK cutter and also collecting the loose oil palm fruitlets off the ground.

Publisher

Penerbit UTM Press

Subject

General Engineering

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3