1. Alisto Engineering Group, 2001, Annual report evaluation of corrective action for year 2000–2001: Pacific Gas and Electric Company, Hinkley Compressor Station, Hinkley, Calif.: San Francisco, Calif., Pacific Gas and Electric Company, prepared by Alisto Engineering Group, Walnut Creek, Calif., [variously paged].
2. Andrews, C.B., and Neville, C.J., 2003, Ground water flow in a desert basin—Challenges of simulating transport of dissolved chromium: Groundwater, v. 41, no. 2, p. 219–226. [Available at https://doi.org/10.1111/j.1745-6584.2003.tb02585.x.]
3. ARCADIS, 2008, Fourth quarter 2007 monitoring report for the central area in situ remediation pilot study: San Francisco, Calif., Pacific Gas and Electric Company, prepared by ARCADIS, Oakland, Calif., RC000699, [variously paged], accessed November 27, 2018, at https://documents.geotracker.waterboards.ca.gov/esi/uploads/geo_report/3207217156/SL0607111288.PDF.
4. ARCADIS, 2016a, Annual cleanup status and effectiveness report (January to December 2015) Pacific Gas and Electric Company, Hinkley Compressor Station, Hinkley, California: San Francisco, Calif., Pacific Gas and Electric Company, prepared by ARCADIS, Oakland, Calif., RC000699, [variously paged], accessed February 2016, at https://documents.geotracker.waterboards.ca.gov/esi/uploads/geo_report/5010230779/SL0607111288.PDF.
5. ARCADIS, 2016b, Updated conceptual site model and background chromium concentrations for lower aquifer report, Hinkley Compressor Station, Hinkley, California: San Francisco, Calif., Pacific Gas and Electric Company, prepared by ARCADIS, Oakland, Calif., RC000699.0142, [variously paged], accessed November 28, 2018, at https://geotracker.waterboards.ca.gov/esi/uploads/geo_report/9069337844/SL0607111288.pdf.