Author:
Zhang Jian,Zhang Shihua,Ding Yong,Zhu David Z.
Abstract
AbstractSite investigation, deformation monitoring, laboratory test, and theoretical calculations were used to analyze the evolution details of a large expressway roadside landslide during the start-up sliding process. The monitoring results show that the initial deformation and failure occurred on the protective wall at the slope toe, then gradually developed to the upper part of the slope, and finally led to tensile cracks at the slope trailing edge. Accelerated deformation of the slope support structures, such as the protective wall at the slope toe, the anti-slide pile, and the anchor cable, were observed during the continuous extreme rainfall. The infiltrated rainwater can change the weight, the osmotic pressure, the anti-sliding force, the sliding force of the sliding mass, and further soften the fully weathered tuff soil and reduce its strength, resulting in the landslide occurrence. Block the slope surface runoff is an effective measure to reduce the landslide risk. The current analysis will be helpful to the prevention, control, and emergency disposal of similar landslides.
Funder
National Natural Science Foundation of China
Natural Science Foundation of Zhejiang Province
Natural Science Foundation of Ningbo
Publisher
Springer Science and Business Media LLC
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献