Author:
Wang Meng,Kang Jiaxu,Liu Weiwei,Li Meng,Su Jinshuai,Fang Zhongzheng,Li Xin,Shang Liyou,Zhang Fan,Guo Chengbin
Abstract
AbstractCoal is a non-renewable fossil energy source on which humanity relies heavily, and producing one ton of raw coal requires the discharge of 2–7 tons of mine water from the ground. The huge drainage task increases the cost of coal mining in coal mines significantly, so saving the drainage cost while guaranteeing the safe production of coal mines is a problem that needs to be solved urgently. Most of the fuzzy controllers used in the traditional dynamic planning methods applied to mine drainage are two-dimensional fuzzy controllers with limited control effect, so the traditional two-dimensional fuzzy controllers are improved by introducing the rate of change of gushing water to form a three-dimensional fuzzy controller with three-dimensional control of instantaneous section—water level—rate of change of gushing water, and at the same time, the optimized dynamic planning method is designed by combining the Avoiding Peak Filling Valley strategy and the optimal dy-namic planning method is used in conjunction with the un-optimized dynamic planning method. The optimized dynamic planning method is applied to the same coal mine water silo gushing water experiments; experimental comparison found that the pumping station system before the optimi-zation of the electricity consumed is 52,586 yuan/day, while after the optimization of the electricity consumed is reduced to 41,692 yuan/day, the cost per day consumed compared with the previous reduction of 20.69%, a year can be saved 3,969,730 yuan. Therefore, the mine water bin drainage method based on fuzzy control and Avoiding Peak Filling Valley strategy proposed in this paper can be used as an improvement method of the existing mine drainage method, which can further ex-pand the economic benefits of coal mines and realize safe production while realizing cost savings.
Publisher
Springer Science and Business Media LLC