Abstract
AbstractLongwall mining method is widely used for underground coal production in the world. Additional stresses occur surrounding the longwall during underground mining. Stresses occurring surrounding the longwall are investigated by many researchers for years. How these stresses affect longwall production, gob, main gate, tailgate and main haulage road has been always an important issue. In this study, the effect of the safety pillar left at the end of the panel on the main haulage road is investigated. For this purpose, 6 models with different pillar distances are created and the stresses occurring in the main haulage road, tailgate and main gate at different pillar distances are examined. It has been demonstrated with numerical models that the optimum pillar distance according to these stress conditions does not damage the main haulage road, tailgate and main gate. In addition, the pillar distance of 10 m gives maximum coal recovery efficiency, and it has been shown by numerical models that the stresses occurring in the main haulage road, main gate and tailgate are not damaging to these galleries.
Publisher
Springer Science and Business Media LLC
Reference44 articles.
1. Hartman, H. L. & Mutmansky, J. M. Introductory Mining Engineering. Introductory Mining Engineering (2002).
2. Peng, S. S. & Chiang, H. S. Longwall mining (Wiley, 1984).
3. Hebblewhite, B. K. Future trends for underground thick seam coal mining in Australia. in Australasian Institute of Mining and Metallurgy Publication Series (2000).
4. Özfırat, M., Şimşir, F. & Gonen, A. A Brief Comparison of Longwall Methods Used at Mining of Thick Coal Seams. Proc. 19th Int. Min. Congr. Fair Turk. IMCET Izmir Turk. (2005).
5. Yasitli, N. E. & Unver, B. 3D numerical modeling of longwall mining with top-coal caving. Int. J. Rock Mech. Min. Sci. https://doi.org/10.1016/j.ijrmms.2004.08.007 (2005).