1. Zhiqing, D. I. N. G. Analysis of mining sequence and working face roadway layout form of close-distance coal seams. Energy Energy Conserv. 9, 27–28 (2019).
2. Huaiqian, L. I. U. et al. Study on the instability mechanism and control measures of a roadway in a mine with retained coal cillars and close coal seams. Shock. Vib. 2021, 1–14 (2021).
3. Cheng, P. Stress concentration transmission of coal pillar with contiguous coal seam and roadway partitioned supporting measures. Coal Min. Technol. 21(6), 31–34 (2016).
4. Zhang, W., Zhang, D. & Chen, J. Determining the optimum gateway location for extremely close seams. J. China Univ. Min. Technol. 41(2), 182–187 (2012).
5. Yan, L. U. et al. Study on the optimal layout of roadways of contiguous seams by simultaneous mining. J. Min. Saf. Eng. 29(6), 797–801 (2012).