Author:
He Ji,Tang Yefeng,Guo Xiaoqi,Chen Haitao,Guo Wen
Abstract
AbstractReservoir flood control scheduling is a challenging optimization task, particularly due to the complexity of various constraints. This paper proposes an innovative algorithm design approach to address this challenge. Combining the basic walrus optimization algorithm with the adaptive ε-constraint method and introducing the SPM chaotic mapping for population initialization, spiral search strategy, and local enhancement search strategy based on Cauchy mutation and reverse learning significantly enhances the algorithm's optimization performance. On this basis, innovate an adaptive approach ε A New Algorithm for Constraints and Multi Strategy Optimization Improvement (ε-IWOA). To validate the performance of the ε-IWOA algorithm, 24 constrained optimization test functions are used to test its optimization capabilities and effectiveness in solving constrained optimization problems. Experimental results demonstrate that the ε-IWOA algorithm exhibits excellent optimization ability and stable performance. Taking the Taolinkou Reservoir, Daheiting Reservoir, and Panjiakou Reservoir in the middle and lower reaches of the Luanhe River Basin as a case study, this paper applies the ε-IWOA algorithm to practical reservoir scheduling problems by constructing a three-reservoir flood control scheduling system with Luanxian as the control point. A comparative analysis is conducted with the ε-WOA, ε-DE and ε-PSO (particle swarm optimization) algorithms.The experimental results indicate that ε-IWOA algorithm performs the best in optimization, with the occupied flood control capacity of the three reservoirs reaching 89.32%, 90.02%, and 80.95%, respectively. The control points in Luan County can reduce the peak by 49%.This provides a practical and effective solution method for reservoir optimization scheduling models. This study offers new ideas and solutions for flood control optimization scheduling of reservoir groups, contributing to the optimization and development of reservoir scheduling work.
Publisher
Springer Science and Business Media LLC
Reference37 articles.
1. Liu, Y., Bai, X., Dong, Y., Wang, H. & Diao, Y. Study on flood optimal operation of reservoir based on SA-FOA. IEEE 1, 1. https://doi.org/10.1109/AIEA53260.2021.00061 (2021).
2. Jibin, X., Shasha, L., Gaoshan, R. & Aili, L. Review and calculation of design flood for the reinforcement engineering of Liulixi reservoir. Small Hydropower 204, 32–34 (2018).
3. Lu, X., Jia, L. & Jun, L. Discussion on the Design Flood and Flood Control Review Methods for Small Reservoirs Hydropower Economy (2018).
4. Yinghai, L. et al. Research on the staged flood control limit water level of Xiangjiaba reservoir considering the regulation and storage impact of Xiluodu reservoir. Hydrology 41, 6. https://doi.org/10.19797/j.cnki.1000-0852.20200203 (2021).
5. Luo, J., Qi, Y., Xie, J. & Zhang, X. A hybrid multi-objective PSO–EDA algorithm for reservoir flood control operation. Appl. Soft Comput. 34, 1. https://doi.org/10.1016/j.asoc.2015.05.036 (2015).
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献