Li Pinpin,Lu Feng,Huang Haiyun,Qiu Wenge
Abstract
AbstractThis paper is based on the proximity engineering project of the Baishiyi tunnel group passing under the Chongqing West Station track group. Considering the train load and the spatial relationship of the tunnel and track groups, the settlement patterns, horizontal displacement, and differential settlement of the tunnel–strata–tracks system during the excavation process are studied through theoretical calculations and numerical simulation methods. The results indicate that the tunnel vault, strata, and track settlement deformation patterns are similar. Throughout the tunnel construction process, the tracks underwent uplift, settlement, and eventually stabilized. The settlement trough formed by the excavation of the three tunnels below the track group has an impact range of 25–145 m. Between 35 and 75 m, the differential settlement of the double track gradually increases with excavation. As the tunnel face reaches 75 m, the track differential settlement gradually converges and tends to stabilize. To minimize the impact of underpass tunnel construction on track groups, it is recommended to use a combination of full-section hole grouting and surface reinforcement grouting for ground reinforcement. Additionally, optimizing the construction parameters, including the step length and primary support closure time, and strengthening the locking anchor can further reduce the impact.
Funder
Natural Science Foundation of Sichuan
National Natural Science Foundation of China
Publisher
Springer Science and Business Media LLC
Reference21 articles.
1. Shahin, HMd., Nakai, T., Ishii, K., Iwata, T. & Kuroi, S. Investigation of influence of tunneling on existing building and tunnel: Model tests and numerical simulations. Acta Geotech. 11, 679–692 (2016).
2. Li, P., Huang, H. & Qiu, W. Investigation of deformation influence on throat area of highway tunnel across the railway station. IOP Conf. Ser. Mater. Sci. Eng. 741, 012056 (2020).
3. Fu, J., Zhao, N., Qu, Y., Yang, J. & Wang, S. Effects of twin tunnel undercrossing excavation on the operational high speed railway tunnel with ballastless track. Tunn. Undergr. Space Technol. 124, 104470 (2022).
4. Veselý, P., Kavička, A. & Krýže, P. Automated construction of mesoscopic railway infrastructure models supporting station throat capacity assessment. IEEE Access 11, 37869–37899 (2023).
5. Zhao, X. The settlement law and construction control of railway hubtraversed by a shield tunnel in soft ground. Hazard Control Tunn. Undergr. Eng. 4, 59–65 (2022).