Research on process parameter optimization of irregular coal face

Author:

Li Qinghai,Wang Zijun,Liu Nan,Zhang Haoran,Li Zhaoying

Abstract

AbstractBased on the engineering background of 1353 working face in Daizhuang Coalmine, the paper identifies three primary issues with the working face mining process: conventional pressure relief means are limited, risk of impact and the length of working face changes, It also proposes comprehensive control measures to improve the blasting roof cutting scheme, optimize mining speed and the location of the stopping line. The three improvement measures mentioned above are simulated numerically, and the effects of the drilling and blasting plan, mining speed, and stopping line location on stress distribution are determined. The results show that by implementing the three improvement measures, the stress variation interval can be efficiently controlled and the working face's production safety can be increased. Finally, it is determined that the 1353 working face of Daizhuang Coalmine adopts the pressure relief method of drilling on one side and cutting the roof 20 m deep on the other side, and the mining speed of the working face is 3 m/day and the length of the stopping line is 85 m. Based on the on-site monitoring results, the implementation of comprehensive treatment measures can effectively improve the surrounding rock state of 1353 working face, which has certain guiding significance for the mining of irregular working face.

Funder

National Natural Science Foundation of China

Publisher

Springer Science and Business Media LLC

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3